Oil, Gas and Petrochemicals

March 21, 2020

Petroleum Pipe Lines Co. (PPC) – Suez gas pumping station

Project Year 1986 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: Halon 1301 systems.
March 21, 2020

Suez Oil Processing Company

Project Year 1987 Scope of Work: Design, engineering, supply, installation, commissioning and handing over. Systems installed: CO2 systems for 3 electrical substations.
March 21, 2020

Ein El- Sokhna and Sidikrier Tank Farm

Project Year 1988 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: Linear heat detection and Halon 1211 systems (3200 lbs.) for 4 […]
March 21, 2020

Gulf of Suez Petroleum Company (GUPCO)

Project Year 1993 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: CO2 systems for Gas Turbines and generators (23 offshore &12 onshore).
March 21, 2020

Misr Petroleum Company Lube Oil Plant

Project Year 1997 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: FM200 systems (12000 lbs.) in weatherproof cabinets.
March 21, 2020

Cairo Oil Refining Co. (CORC) Light Naphtha, Enppi

Project Year 1999 Scope of Work: Design, engineering, supply, installation, commissioning and handing over. Systems installed: Intelligent addressable fire detection and alarm system. Sprinklers system (3000) […]
March 21, 2020

Egyptian Turkish Petroleum Co. ETPCO

Project Year 2001 Scope of Work: Design, engineering, supply, commissioning, and handing over. Systems installed: Foam systems. Cooling systems for fixed roof tanks. Portable extinguishers. Hose […]
March 21, 2020

Babcock Wilcox Espanola (Suez Oil Processing Company)

Project Year 2001 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: Intelligent addressable fire detection and alarm system CO2 systems. Water spray […]
March 21, 2020

East Zeit Petroleum Company, Zeitco

Project Year 2001 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: FM-200 system for the new MCC room (off-shore rig). Halon replacement […]
March 21, 2020

Archroidon/ El Behera Natural Gas Liquefaction Co.

Project Year 2002 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: Detection and Alarm system. FM-200 system for the jetty control room.
March 21, 2020

Petro-gulf Misr

Project Year 2008 Scope of Work: Design, engineering, supply, installation, commissioning and handing over. Systems installed: FM-200 system. CO2 system. Deluge Systems for the Alfa Platform
March 21, 2020

Gulf Petroleum Suez Company Gas Plant

Project Year 2009 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: FM-200 systems for the switch gear building PH I, switch gear […]
March 21, 2020

PPC Floating roof tank # 14, Petrosafe

Project Year 2010 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: Low expansion foam system. Water cooling system.
March 21, 2020

SUMED SidiKerier new substation, Petrojet

Project Year 2012 Scope of Work: Design, engineering, Supply, commissioning and handing over. Systems installed: Intelligent addressable fire detection and alarm system FM-200 System.
March 21, 2020

SUMED Storage Capacity Expansion Project, ENPPI

Project Year 2012 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: FM-200 systems for the electrical substations (4660 lbs.).
March 21, 2020

SUCO – Egyptian Maintenance Company

Project Year 2012 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: CO2 systems for the gas turbines.
March 21, 2020

Gulf Petroleum Suez Company

Project Year 2012 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: Halon Replacement with CO2 systems for the off-shore gas turbines.
March 21, 2020

Khalda Petroleum Company

Project Year 2013 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: FM-200 systems for Kalabsha control building (10200 lbs.).
March 21, 2020

Petrobel – Egyptian Maintenance Co.

Project Year 2017 Scope of Work: Design, engineering, supply, installation, commissioning and handing over. Systems installed: Intelligent addressable fire detection and alarm system Gas Detection system. […]