Project Year
- 1988
Scope of Work:
- Design, engineering, supply, installation, commissioning and handing over.
Systems installed:
- Fire detection and alarm system
- Lo-Ex foam systems for fuel tanks.
- Med-Ex foam systems for the dike area.
- Water-cooling systems.