Project Year 1987 Scope of Work: Design, engineering, supply, installation, commissioning and handing over. Systems installed: CO2 systems for 3 electrical substations.
Project Year 1988 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: Linear heat detection and Halon 1211 systems (3200 lbs.) for 4 […]
Project Year 1993 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: CO2 systems for Gas Turbines and generators (23 offshore &12 onshore).
Project Year 1997 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: FM200 systems (12000 lbs.) in weatherproof cabinets.
Project Year 1999 Scope of Work: Design, engineering, supply, installation, commissioning and handing over. Systems installed: Intelligent addressable fire detection and alarm system. Sprinklers system (3000) […]
Project Year 2001 Scope of Work: Design, engineering, supply, commissioning, and handing over. Systems installed: Foam systems. Cooling systems for fixed roof tanks. Portable extinguishers. Hose […]
Project Year 2001 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: Intelligent addressable fire detection and alarm system CO2 systems. Water spray […]
Project Year 2001 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: FM-200 system for the new MCC room (off-shore rig). Halon replacement […]
Project Year 2002 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: Detection and Alarm system. FM-200 system for the jetty control room.
Project Year 2008 Scope of Work: Design, engineering, supply, installation, commissioning and handing over. Systems installed: FM-200 system. CO2 system. Deluge Systems for the Alfa Platform
Project Year 2009 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: FM-200 systems for the switch gear building PH I, switch gear […]
Project Year 2010 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: Low expansion foam system. Water cooling system.
Project Year 2012 Scope of Work: Design, engineering, Supply, commissioning and handing over. Systems installed: Intelligent addressable fire detection and alarm system FM-200 System.
Project Year 2012 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: FM-200 systems for the electrical substations (4660 lbs.).
Project Year 2012 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: Halon Replacement with CO2 systems for the off-shore gas turbines.
Project Year 2013 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: FM-200 systems for Kalabsha control building (10200 lbs.).
Project Year 2017 Scope of Work: Design, engineering, supply, installation, commissioning and handing over. Systems installed: Intelligent addressable fire detection and alarm system Gas Detection system. […]