Project Year 2009 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: FM-200 systems for the switch gear building PH I, switch gear […]
Project Year 2010 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: Low expansion foam system. Water cooling system.
Project Year 2012 Scope of Work: Design, engineering, Supply, commissioning and handing over. Systems installed: Intelligent addressable fire detection and alarm system FM-200 System.
Project Year 2012 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: FM-200 systems for the electrical substations (4660 lbs.).
Project Year 2012 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: Halon Replacement with CO2 systems for the off-shore gas turbines.
Project Year 2013 Scope of Work: Design, engineering, supply, commissioning and handing over. Systems installed: FM-200 systems for Kalabsha control building (10200 lbs.).
Project Year 2017 Scope of Work: Design, engineering, supply, installation, commissioning and handing over. Systems installed: Intelligent addressable fire detection and alarm system Gas Detection system. […]